Demolition of building (BE)

We recently had the opportunity to remove an entire structure, including foundations, for a regular client in Antwerp (BE).
- Location:
- Project type:
- Lead time:
Our Approach
After completing the necessary preparatory activities, such as drafting the required Health, Safety, and Environment plans, Task Risk Analysis, and work meetings, the project could physically commence.
First, the work area was set up and the asbestos removed; subsequently, the removal of the building and the associated foundations commenced.
The building situated beneath a pipe bridge was safely removed by Bottelier 's skilled personnel to the client's full satisfaction and without incident. The site was subsequently handed over to the client ready for construction.